| T |
Tank
(NTR staging tank) |
| T2 |
Second
ISS Treadmill |
| T&E |
Test & Evaluation |
| TBD |
To
Be Determined |
| TBD |
To
Be Decided |
| TC |
Thermal
Control |
| TCPI |
To
Complete Performance Index |
| TDRSS |
Tracking
and Data Relay Satellite System |
| TEI |
Trans-Earth
Injection |
| TEM |
Transmission
Electron Microscope |
| TEMP |
Test
and Evaluation Management Plan |
| TEMP |
Test
and Evaluation Master Plan |
| TIGER-3D |
Transition
from Ignition to Flame Growth Under External Radiation in Three
Dimensions |
| TIM |
Technical
Interchange Meetings |
| TLI |
Trans-Lunar
Injection |
| TO |
Trade
Option |
| TOC |
Total
Ownwership Cost |
| TØFFy |
Two-Phase
Flow Facility |
| TPFE |
Two-Phase
Flow Experiment |
| TPHT |
Two-Phase
Heat Transfer |
| TPM |
Technical
Performance Measurement |
| TPM
ALS |
Two
Phase Modeling |
| TRL |
Technology
Readiness Level |
| TRP |
Transition
Research Projects |
| TS |
Thermal
Systems |
| TSC |
TeleScience
Center |
| TSH-ES |
Triaxial
Sensor Head-Ethernet Standalone |
| TV |
Technical
View |
| TVIS |
Treadmill
with Vibration Isolation and Stabilization |
| TVR |
Test
and Verification Review |
| TWH |
Technical
Warrant Holders |
| |
|
| |
|
| |
|
| |
|