| I&O |
Integration
and Operations |
| IA |
Independent
Assessment |
| IAO |
International
Announcement of Opportunity |
| IBPD |
Integrated
Budget and Performance Document |
| IBR |
Integrated
Baseline Reviews |
| ICA |
Independent
Cost Assessment |
| ICAT |
Independent
Cost Assessment Team |
| ICD |
Interface
Control Document |
| ICE |
Interface
Configuration Experiment |
| ICP |
Intramural
Call for Proposal |
| ICR |
Initial
Confirmation Review |
| ICR |
Investigation
Continuation Review |
| ICU |
Interim
Control Unit |
| ID |
Incremental
Development |
| IDD |
Interface
Definition Document |
| IEEE
/ EIA |
Institute
of Electrical and Electronics Engineers / Electronic Industries
Association |
| IFB |
Invitation
For Bid |
| IGA |
Inter-Governmental
Agreement |
| IGCE |
Independent
Government Cost Estimate |
| ILS |
Integrated
Logistics Support |
| IMS |
Integrated
Master Schedule |
| InSPACE |
Investigating
the Structur of Paramagnet Aggregates from Colloidal Emulsions |
| IOC |
Initial
Operational Capability |
| IOP |
Input
Output Package |
| IPA |
Independent
Program Assessment |
| IPAO |
Independent
Program Assessment Office |
| IPAT |
Independent
Program Assessment Team |
| IPO |
Institutional
Program Office |
| IPP |
Innovative
Partnerships Program |
| IPS |
Integrated
Program Summary |
| IPSU |
Image
Processing & Storage Unit |
| IPT |
Integrated
Product Team |
| IR |
Infared |
| IRB |
Internal
Reference Base |
| IRD |
Interface
Requirements Document |
| IRED |
Interim
Resistive Exercise Device |
| IRR |
Interim
Research Review |
| ISFR |
In-Situ
Fabrication and Repair |
| ISLSP |
In-Situ
Life Support Processes |
| ISO |
International
Organization for Standardization |
| ISRU |
In
Situ Resource Utilization |
| ISS |
International
Space Station |
| IT |
Information
Technology |
| ITAR |
International
Traffic in Arms Regulations |
| IV&V |
Independent
Verification and Validation |
| IVA |
Intravehicular
Activity |
| IVGEN |
Intra
Venous Water GENeration |
| |
|
| |
|
| |
|