| C4ISP |
Command,
Control, Communications, Computers and Information Systems Protection |
| CAD |
Cost
Analysis Division |
| CADRe |
Cost
Analysis Data Requirement |
| CAI |
Communications,
Avionics, and Informatics |
| CAIB |
Columbia
Accident Investigation Board |
| CAIG |
Cost
Analysis Improvement Group |
| CAIV |
Cost
as an Independent Variable |
| CARD |
Cost
Analysis Requirements Document |
| CBE |
Current
Best Estimate |
| CBT |
Computer
Based Training |
| CCA |
Clinger-Cohen
Act |
| CCB |
Configuration
Control Board |
| CCF |
The
Cleveland Clinic Foundation |
| CCF |
Critical
Velocoties in Open Capillary Channels |
| CCR |
Central
Contractor Registry |
| CCRM |
Continuous
Cost Risk Management |
| CD |
|
| CDD |
Capability
Development Document |
| CDOT |
Colloidal
Disorder-Order Transitions Experiment |
| CDR |
Critical
Design Review |
| CDRL |
Contrac
Data Requirements List |
| CECE |
Common
Extensible Cryogenic Engine |
| CERR |
Critical
Events Readiness Review |
| CEV |
Crew
Exploration Vehicle |
| CEVIS |
Cycle
Ergometer with Vibration Isolation System |
| CFE |
Capillary
Flow Experiment |
| CFM-2 |
Candle
Flames in Microgravity-2 |
| CFO |
Chief
Financial Officer |
| CGBA |
Commercial
Generic Bioprocessing Apparatus |
| CHAINS |
Chain
Aggregation Investigation by Scattering (GAST) |
| CHESS |
Condensing
Heat Exchanger for Space Systems |
| CI |
Counter-Intelligence |
| CIA |
Chamber
Insert Assembly |
| CIBS |
Coalescence
Inhabition of Bubbly Suspensions Experiment |
| CIO |
Chief
Information Office |
| CIR |
Combustion
Integrated Rack |
| CL |
Contact
Line |
| Clean-Flame |
Field
Effects of Gravity on Lean Premixed Turbulent Flames |
| CLiDE |
Contact
Line Dynamics Experiment |
| CM |
Configuration
Management |
| CM-2 |
Combustion
Module-2 |
| CMT |
Critical
Mission Task |
| CNC |
Condensation
Nuclei Counter |
| CO |
Contracting
Officer |
| COFC |
Court
of Federal Claims |
| CoFR |
Certification
of Flight Readiness |
| COLLIDE-2 |
Collisions
into Dust Experiment - 2 |
| Con
Ops |
Concept
of Operations |
| COTR |
Contracting
Officer Technical Representative |
| COTS |
Commercial
Off The Shelf |
| CP-2L |
CVB/PHaSE-2/PCS-2/LFCA |
| CPAF |
Cost
Plus Award Fee |
| CPAF/IF |
Cost
Plus Award Fee / Incentive Fee |
| CPD |
Capability
Production Document |
| CPFF |
Cost
Plus Fixed Fee |
| CPI |
Cost
Performance Index |
| CPI
/ SPI |
Cost
Performance Index / Schedule Performance Indicator |
| CPIF |
Cost
Performance Index Fixed |
| CPIF |
Cost
Plus Incentive Fee |
| CPM |
Critical
Path Method |
| CR |
Change
Request |
| CRA |
Continuing
Resolution Authority |
| CRL |
Countermeasure
Readiness Levels |
| CRM |
Continuous
Risk Management |
| CRR |
Crew
Readiness Review |
| CRT |
Contingency
Response Technologies |
| CRWT |
Containerless
Ripple Wave Turbulence |
| CSC |
Consulting
Support Center |
| CSD |
Comparative
Soot Diagnostics |
| CSI |
Crop
System Interface |
| CSLM |
Coarsening
in Solid-Liquid Mixtures |
| CSLM-2 |
Coarsening
in Solid-Liquid Mixtures-2 |
| CSM |
Center
for Space Medicine |
| CV |
Cost
Variance |
| CVB |
Constrained
Vapor Bubble Experiment |
| CVX-2 |
Critical
Viscosity of Xenon-2 |
| CY |
Calendar
Year |
| |
|
| |
|
| |
|