| PA |
Power
Amplifier |
| PA |
Product
Assurance |
| PACE |
Physics
and Chemistry Experiment Program |
| PACS |
Pointing
And Control System |
| PAD |
Program
Approval Document |
| PaDR |
Payload
Design Review |
| PAH |
Payload
Accommodations Handbook |
| PAI |
Product
Assurance Instruction |
| PAM |
Payload
Accommodation Manager |
| PAM |
Payload
Assist Module |
| PAM |
Project
Assurance Manager |
| PAM |
Project
Assurance Manual |
| PAP |
Product
Assurance Plan |
| PASLB |
Passive
Acoustics Stabilization of Liquid Bridges |
| PBE |
Pool
Boiling Experiment |
| PBM-1 |
Pool
Boiling Module-1 |
| PC |
Personal
Computer |
| PCA |
Payload
Clamp Assembly |
| PCB |
Power
Control Box |
| PCCE |
Particle
Cloud Combustion Experiment |
| PCDA |
Power
Control and Distribution Assembly |
| PCG |
Protein
Crystal Growth |
| PCGS |
Protein
Crystal Growth System |
| PCM |
Pulse
Code Modulation |
| PCM |
Pulse
Code Modulator |
| PCR |
Payload
Certification Review |
| PCTC |
Payload
Crew Training Complex |
| PCS |
Portable
Computer System |
| PCS |
Physics
of Colloids in Space Experiment, LMM-3 |
| PCS+ |
Physics
of Colloids in Space Experiment Plus |
| PCS-2 |
Physics
of Colloids in Space Experiment-2 |
| PCS-3 |
Physics
of Colloids in Space Experiment-3 |
| PCU |
Power
Control Unit |
| PCU |
Payload
Checkout Unit |
| PCU |
Power
Conversion Unit |
| PDA |
Payload
Accommodations |
| PDC |
Payload
Developement Center |
| PDI |
Particle
Displacement Interfermetry |
| PDP |
Plasma
Diagnostics Package |
| PDR |
Preliminary
Design Review |
| PDRD |
Program
Definition and Requirements Document |
| PDSS |
Payload
Development Support System |
| PDT |
Product
Development Team |
| PE |
Principle
Engineer |
| PED |
Payload
Element Developer |
| PEPWG |
Pressurized
Element Working Group |
| PF |
Platform
|
| PFA |
Post-Flight
Annex |
| PFDAR |
Post-Flight
Data Analysis Review |
| PFE |
Portable
Fire Extinguisher |
| PFM |
Protoflight
Model |
| PFP |
Program
and Financial Plan |
| PGS |
Power
Generation Subsystem |
| pH |
Hydrogen
lons in Gram Atoms per Liter |
| PHaSE |
Physics
of Hard Spheres Experiment |
| PHaSE-2 |
Physics
of Hard Spheres Experiment-2 |
| PI |
Payload
Interrogator |
| PI |
Preliminary
Investigation |
| PI |
Principal
Investigator |
| PIA |
Payload
Interface Agreement |
| PIC |
Project
Initiation Conference |
| PID |
Prime
Item Development (Spec) |
| PID |
Proportional,
Integral, and Differential Gain |
| PID |
Program
Introduction Document |
| PIMS |
Principal
Investigator Microgravity Services |
| PIP |
Payload
Integration Plan |
| PIRN |
Preliminary
Interface revision Notice |
| PIV |
Particle
Imaging Velocimeter |
| PKE |
Plasma
Krystal Experiment |
| PL |
Payload
|
| PM |
Program
Manager |
| PM |
Project
Manager |
| PMAD |
Power
Management and Distribution |
| PMC |
Permanent
Manned Capability |
| PMC |
Program
Management Council |
| PMIC |
Payload
Missions Integration Contractor |
| PMMA |
Polymethl
Methacrylate |
| PMMS |
Process
Material Management System |
| PMR |
Program
Management Review |
| PMT |
photomultiplier
tube |
| PMZF |
Programmable
Multi-Zone Furnace |
| POCC |
Payload
Operations Control Center |
| POD |
Payload
Operations Director |
| POIC |
Payload
Operation and Integration Center |
| POO |
Pallet
of Opportunity |
| POOC |
Payload
of Opportunity Carrier |
| POP |
Program
Operating Plan |
| POP |
Perpendicular
to Orbit Plane |
| POWG |
Payload
Operations Working Group |
| PP/L |
Partial
Payload |
| PP |
Phase
Partitioning |
| PP |
Planning
Package |
| PP&C |
Payload
Planning and Control |
| PPE |
Phase
Partitioning Experiment |
| PPMR |
Payload
Program Manager's Review |
| PPO |
Planning
Purposes Only |
| PRACA |
Problem
Reporting and Corrective Action |
| PRCB |
Program
Requirements Change Board |
| PRCU |
Payload
Rack Checkout Unit |
| PRE |
Performance
Requirements Envelope |
| PROM |
Programmable
Read-Only Memory |
| PRR |
Program
Requirements Review |
| PRR |
Preliminary
Requirements Review |
| PS |
Phase
Separation |
| PS |
Project
Scientist |
| PS |
Payload
Specialist |
| PSC |
Performing
Support Center |
| PSCN |
Program
Support Communications Network |
| PSE |
Payload
Simulator Environment |
| PSH |
Payload
Support Hardware |
| psia |
Pounds
Per Square Inch Absolute |
| PSR |
Pre-Ship
Review |
| PSRD |
Payload
Simulator Requirements Document |
| PSTR |
Pre-Storage
Review |
| PTCU |
Payload
Training Center Unit |
| PTT |
Part
Task Trainer |
| PUFF |
Combustion
Characteristics of Fully-Modulated, Turbulent Diffusion Flames |
| PV |
Photovoltaic
|
| PVP |
Payload
Verification Plan |
| PVT |
Physical
Vapor Transport |
| PVTOS |
Physical
Vapor Transport of Organic Solutions (3M) |
| R&D |
Research
and Development |
| R&M |
Reliability
and Maintainability |
| R&PM |
Research
and Program Management |
| RAHF |
Research
Animal Holding Facility |
| RAU |
Remote
Acquisition Unit |
| RBFS |
Risk-Based
Fire Safety |
| RCB |
Requirements
Change Board |
| RCG |
Reference
Concept Group |
| RCS |
Reaction
Control System |
| RDR |
Requirements
Definition Review |
| REEFS |
Radiative
Enhancement Effects on Flame Spread |
| REU |
Remote
Electronic Unit |
| RF |
Radio
Frequency |
| RFCA |
Rack
Flow Control Assembly |
| RFI |
Radio
Frequency Interference |
| RFP |
Request
For Proposal |
| RFQ |
Request
For Quotation |
| RGF,GFM-4 |
Regimes of Granular Flow |
| RHA |
Rack
Handling Adaptor |
| RI |
Rockwell
International |
| RID |
Review
Item Discrepancy |
| RIEF |
Recirculating
Isoelectric Focusing |
| RIP |
Rack
Interface Panel |
| RITSI |
Radiative
Ignition and Transition to Spread Investigation |
| RKT |
Rocket |
| RMMR |
Reactionless
Microgravity Mechanisms and Robotics |
| RME |
Risk
Mitigation Experiment |
| RMS |
Remote
Manipulator System |
| RMSA |
Rack
Maintenance Switch Assembly |
| ROC |
Regional
Operations Center |
| RP |
Rocket
Propellant |
| RP |
Reference
Publication |
| RPC |
Remote
Power Controller |
| RPCM |
Remote
Power Controller Module |
| RPDP |
Recoverable
Plasma Diagnostics Package |
| RPI |
Rensselaer
Polytechnic Institute |
| RPWG |
Resource
Planning Writing Group |
| RR |
Requirements
Review |
| RTOP |
Research
and Technology Operations Plans |
| RTS |
Remote
Triaxial Sensors |
| RUP |
Rack
Utility Panel |
| RUR |
Requirements
Update Review |
| RUR |
Reference
Update Review |
| RVP |
Requirements
Verification Plan |